[vc_row][vc_column][vc_column_text]This 5-acre stormwater project drains over 40 acres of industrial sites. ArcheWild designed, constructed, and planted the entire site, which included three ponds and an observation platform. Approximately 3000 yards of construction debris, reinforced concrete slabs, and invasive plant material was moved. Over 10,000 new native wetland and terrestrial plants plants installed.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_media_grid element_width=”2″ grid_id=”vc_gid:1480349931902-68b0f06e-090b-7″ include=”446,445,444,443,442,441,440,439,438,437,44,43,42,41,39,38,37,36,35,30,29,28″][/vc_column][/vc_row]